Wharves & Jetties
Slabs, beams, fenders, and mooring bollards.
Port infrastructure inspection ยท Advanced UAS technology
At HIERAXIS, we evaluate the structural condition of wharves, jetties, breakwaters, and cargo cranes to anticipate failures, prioritize maintenance, and ensure the safety of port operations using state-of-the-art UAS technologies and advanced IT systems.
Real flight over a container terminal: flying over cranes, wharves, and operational areas to document their status.
We cover key port infrastructure assets in their above-water section accessible via drone inspection.
Slabs, beams, fenders, and mooring bollards.
Concrete, steel, and timber piles in visible and tidal zones.
Shelter works, riprap armor layers, and precast concrete elements.
Bollards, fenders, ladders, walkways, and structural fixings.
Aids to navigation and port signaling elements.
Power supply, fire suppression systems, and quay drainage.
STS and yard cranes (RTG): structure, cables, and travel tracks.
Sheds, control booths, and quay-side foundations.
Real photos of Ship-to-Shore (STS) cranes and Rubber-Tyred Gantry (RTG) yard cranes handling containers in port terminals.
No photos in this category yet.
We follow a standardized methodology aligned with port regulations and ROM recommendations in four key phases.
Reviewing drawings, historical inspection logs, and defining scope based on asset type and risk profile.
High-resolution drone flights over the entire above-water structure, collecting georeferenced photos and video.
Classifying defects by severity and urgency, evaluating expected degradation and operational risk.
Delivering a technical report with prioritized maintenance actions and indicative repair budgets.
Every structural element is assessed against a standardized verification checklist.
Defects are categorized by severity to help managers prioritize maintenance spending.
No significant defects. Standard preventive maintenance schedule.
Superficial or cosmetic wear. Structural capacity unaffected.
Defect requiring tracking during upcoming periodic inspections.
Structural or safety risk. Requires immediate corrective intervention.
Each inspection campaign is summarized in a dashboard displaying overall infrastructure health.
Distribution of element condition across this inspection campaign.
Tell us what you need and we'll get back to you as soon as possible.